Two pilot airports live today; full 130+ AAI network goes live July–August 2026. The honest story of how it's sequenced.

130+
AAI airports · deploying
2
AAI airports · live today
250K+
Pilot responses processed
Jul–Aug
2026
Full network · go-live

A national rollout,
airport by airport.

◆ AAI NETWORK
AIRPORTS AUTHORITY OF INDIA
SELECT A PHASE BELOW
◆ INDIA · AAI NETWORK PHASE 01 · PILOT LIVE
TIR MAA CCU PNQ GOI IDR PAT BBI CJB VTZ IXR RPR SXR ATQ IXC DED VNS IXB AGR JLR IXM IMF DIB
◆ PHASE 1 · LIVE TODAY
2 pilot airports
◆ PHASE 2 + 3 · JUL–AUG 2026
130+ AAI airports
◆ LANGUAGES SUPPORTED
100+ across the network

Map shows a representative selection of AAI-owned airports — the actual network is around 130+ stations across metros, regional hubs, and civil enclaves at defence airfields. Privately-operated airports (DEL, BOM, BLR, HYD, AMD, LKO, JAI, GAU, TRV, COK) sit outside the AAI network; NorthSky's platform is operator-agnostic and runs at private hubs on the same template.

FEATURED CASE STUDY · AAI

Airports Authority
of India.

AAI runs the country's largest airport network — 130+ airports across metros, regional hubs, and civil enclaves. NorthSky AERO is the implementation partner for AAI's DGCA-quarterly Customer Satisfaction Survey programme — deploying AeroFeedback with surveyor apps, kiosks, QR, and digital channels in 100+ languages.

The pilot proved the operation — surveyor adoption was effectively instant, and we now produce DGCA-ready quarterly reports in hours rather than weeks. Network-wide rollout is sequenced for July and August.
PILOT REVIEW · AAI · 2026
CHALLENGE 01 · SCALE

130+ airports.
One response stream.

One platform across metros and regional airports — same survey instrument, same language stack, same response pipeline. AeroFeedback was already multi-tenant at this scale.

CHALLENGE 02 · LANGUAGE

Every official Indian language,
plus the international traveler.

Every official Indian language plus most major world languages — 100+ in total, with passenger-locale auto-detection. Production-tested before AAI began.

CHALLENGE 03 · COMPLIANCE

DGCA quarters,
ICAO service excellence.

DGCA quarterly format, ICAO Doc 9184 alignment, audit trail by design. Reports that took weeks now publish in hours.

CHALLENGE 04 · FIELD

Surveyors who'd
never used an app.

Many AAI surveyors are first-time smartphone users. Large tap targets, offline-first, route-driven workflow. Adoption was effectively instant.

A similar engagement, at your network.

The pilot template becomes your network template — channel mix, regulator format, language coverage, adapted to your scope.

Talk to us

What we learned
at the pilot airports.

◆ HONEST EVIDENCE
WHAT WORKED · WHAT GOT REFINED
NOT A BROCHURE

Four things the pilots taught us — that became the network template.

LESSON 01

First-time smartphone users didn't slow us down.

98% adoption inside the first issue cycle. Large tap targets, route-driven workflow, offline-first sync did the work — not training videos.

REFINED · SURVEYOR APP UX
LESSON 02

Free-text responses came in more languages than we expected.

Passengers chose 14+ Indian languages in free-text, not the three we'd seeded. Taxonomy now ships pre-extended; new languages don't need a re-train.

REFINED · LANGUAGE TAXONOMY
LESSON 03

The DGCA report was the fastest path to credibility.

Regulator-format quarterly in ~2 hours — down from weeks. The DGCA report became the demo, not the survey instrument.

REFINED · DEMO SEQUENCE
LESSON 04

Sensitive categories needed tighter HITL.

Accessibility and safety complaints came through hotter than projected. Tightened the HITL threshold; added a per-customer sensitive-list editor. Every override logged with reason — DGCA-audit-ready.

REFINED · HITL GOVERNANCE

How the platform
does the work at AAI.

◆ HOW THE PLATFORM DOES THE WORK
LIVE AT AAI · TODAY
◆ CAPABILITY 01 ● Live · AAI
Multilingual classification.

Auto-categorised against AAI's taxonomy in the passenger's language — 100+ languages. No manual coding by surveyors.

◆ CAPABILITY 02 ● Live · AAI
DGCA report generation.

250,000+ classified responses become a DGCA-format CSS in ~2 hours. Re-runnable for any past quarter.

◆ CAPABILITY 03 ● Live · AAI
Human-in-the-loop.

Safety, security, accessibility, harassment queue for supervisor review. AI proposes; AAI supervisor decides; every override logged.

Live at AAI today; full network rollout Jul–Aug 2026. See the platform → · AI governance →

The rollout, sequenced.

◆ DEPLOYMENT PLAN
FULL NETWORK · JUL–AUG 2026
01
PILOT · LIVE TODAY

The pilots

Two AAI pilot airports under real passenger load. Every channel live — QR, kiosk, surveyor app, web.

  • 2 AAI pilot airports · production
  • 250,000+ responses processed
  • 98% surveyor adoption · first issue cycle
  • DGCA quarterly cycle proven · ~2 hr generation
02
METRO + REGIONAL · IN PROGRESS

Metro & regional rollout

AAI metros (Chennai, Kolkata) and highest-traffic regionals. Configuration template proven from the pilot.

  • AAI metros · MAA, CCU
  • Tier-2 regionals · PNQ, GOI, IDR, PAT, BBI
  • Go-live · July 2026
03
FULL NETWORK · AUG 2026

Full AAI network

Balance of AAI airports — regional hubs, smaller stations, civil enclaves. Network benchmarking and ACI ASQ feeds.

  • 130+ AAI airports targeted
  • Network benchmarking
  • ACI ASQ feed for participating airports
  • Quarterly DGCA at network scale

Who else this is for.

◆ OPERATOR-AGNOSTIC
AAI · PRIVATE HUBS · REGIONAL · GREENFIELD
SAME PLAYBOOK · SCOPED PROPOSAL

AAI is the largest deployment, not the only fit. The same template adapts to any airport operating model.

BUYER 01 · NATIONAL AUTHORITY

Network-wide passenger-voice programme.

The AAI shape. One implementation partner, one tenancy, one taxonomy across every station. Centralised regulator reporting, per-airport benchmarking.

  • Network-wide enterprise agreement
  • Per-airport tenancy + central rollup
  • Regulator submissions at portfolio scale
  • Network template proven at AAI
BUYER 02 · PRIVATE HUB

A tier-1 airport with its own brand.

Tier-1 hubs — multi-terminal, multi-airline, ACI ASQ-certified. Layered procurement: AeroFeedback first, then AeroResolve, then airfield products as priorities mature.

  • Per-airport enterprise agreement
  • SSO + customer-managed keys
  • Custom integrations + dedicated CSM
  • Hub-grade SLA + 24×7 support
BUYER 03 · REGIONAL / TIER-2

A regional airport with tight resources.

Domestic-heavy, lean ops team, regulator-driven deadlines. Pre-tuned template: no weeks of configuration, no consultant army. AAI playbook compressed to one airport.

  • Single-airport subscription
  • Pre-tuned channels + regulator pack
  • Surveyor app + kiosk + QR
  • Live in weeks, not quarters
BUYER 04 · GREENFIELD

A new airport being commissioned.

New-build airports — Navi Mumbai, Jewar, Bhogapuram-style. No legacy to integrate. Configured during commissioning, live for first commercial flight.

  • Full-suite from commissioning
  • Configured into the build, not retrofitted
  • AeroFeedback + AeroGround + ATOMS from day one
  • Operating record from minute one

Common questions.

◆ FROM CUSTOMERS & PROSPECTS
BUYER-ANTICIPATED

Is this only for AAI?

No. AAI is the largest deployment, but the platform is operator-agnostic. Private hubs, regional airports, greenfield projects run the same template. AAI just proved it at scale.

What does "deploying across 130+ AAI airports" mean today?

NorthSky is AAI's implementation partner for the national CSS programme. Two airports live (the pilots); the rest go live through July–August 2026 on the same configuration template.

Can a private airport procure NorthSky directly?

Yes. Per-airport enterprise subscriptions on the same suite. Most start with AeroFeedback, add AeroResolve, then layer airside products. See the pricing model.

What about airports outside India?

The platform serves any jurisdiction. Regulator-pack templates are jurisdiction-specific (DGCA for India, ACI ASQ globally, ICAO 9184 universally). Non-India deployments quoted in USD; data residency adapts to local requirements.

Become the next case study.

A 30-minute walkthrough on your real airport. Written proposal within five working days.